ESTE SITIO WEB UTILIZA COOKIES

Este sitio web utiliza cookies para mejorar la experiencia del usuario. Al utilizar nuestro sitio web usted acepta todas las cookies de acuerdo con nuestra política de cookies.




Las cookies esenciales permiten funciones básicas y son necesarias para que el sitio web funcione correctamente.
Las cookies estadísticas recopilan información de forma anónima. Esta información nos ayuda a comprender cómo nuestros visitantes utilizan nuestro sitio web.
Las cookies de marketing son utilizadas por terceros o editores para mostrar anuncios personalizados. Lo hacen rastreando a los visitantes a través de los sitios web.



Electronic Interlocking ZSB 2000 - Line Concept

For a complete line concept as well as time and cost optimised network for all operation points at line specific communication interfaces of electronical interlocking ZSB 2000 are used.


Basically there are two communication interfaces available:

  • DISPO serial data bus for:
    • disposition
    • diagnosis/service
  • STRENET serial data bus for:
    • block
    • track clear indication  

These are intelligent interfaces (bus) and they communicate via telegram which include a very deep information variety, although cabling effort between operation interfaces are realised at a minimum. 

In addition to the operation points represented by stations, block posts, passing point junctions and block adaption, level crossings (BUES 2000) can also be linked to the interfaces. In this way the through going cabling of a track with the aid of rail flange cabling makes sense for the first time and opens up a correspondingly large potential for savings in investment costs.

Whereas with the STRENET bus (track network bus) all the operation points along the track and the adjacent stations can communicate with one another in a technically safe manner with the aid of a logical point-to-point connection and a coding algorithm, the safe exchanging of information with the operating centre or, as the case may be, maintenance centre is realised with the DISPO bus (dispatching bus) with the aid of procedure safeguarding. In addition to the DISPO interface the data of other systems, which data has to be transmitted along a railway line, can be transmitted at the same time. This leads to bundling of communication paths and is accordingly cost-efficient. Such data can be, for example, data for passenger information systems, for switch heating systems or for platform lighting control systems.


Additional Information

Interlocking Control System

Interlocking Control System

The system controlling of electronic interlocking ZSB 2000 is responsible for safety controlling and supervision of routes, signals, switch points, track lock and according to its dependences ...

Read more

Train Signals

Train Signals

Railway signals like combination signals, main signals, advance signals or shunt signals are realised with LED light points in 200mm or 80mm dimension ...

Read more

Additional Signals

Additional Signals

Different signal aspects are displayed by special- or additional signals there are e.g. speed indicator with displaying of numbers or signal with special signs like line changing ...

Read more

Axle Counter

Axle Counter

The axle counter Scheidt & Bachmann is responsible for the train detection of Interlocking System ZSB 2000. Axle counting is an integral component of the ZSB 2000 logic ...

Read more

Switchpoint Control System

Switchpoint Control System

The switch control subassembly (WST-BG) is an electronic subassembly for actuating switch mechanisms whereby the changing and monitoring logic is executed ...

Read more

Battery Charger

Battery Charger

The quality of power supply stands for an immediate influence to the availability of electronically interlocking systems ...

Read more

Service Concept

Service Concept

The question in regards of availability and maintenance has an important priority for electronic interlocking systems ...

Read more

Operation Management Concept

Operation Management Concept

The Operation management concept of the electronic interlocking ZSB 2000 is equipped with a central and with a field operation management concept (via MMUI) ...

Read more

Railway Line Concept

Railway Line Concept

For a complete line concept as well as time and cost optimised network for all operation points at line specific communication interfaces of electronical interlocking ZSB 2000 are used ...

Read more

Sales

Phone: +49 2166 266-1296
Fax: +49 2166 266-475

Sales Melsdorf

Phone: +49 4340 4983-0
Fax: +49 4340 4983-101

Contact us

Fields marked with * are required
captcha